Answer by
Robert61 (48)
They had to dig down 65 ft to bedrock to start the foundation. They needed to make a slurry bathtub composed of water and benetonide mixture to keep the ground water from the hudson river out. They excavated about 1. 2 million cubic yards of material out to make the foundation.