Answer by
bes7252 (34)
Read all instructions first. Position studs at specified rough-in locations. Make sure studs are plumb and that a level run horizontal touches all studs. Also verify the drain matches rough-in dimensions. Follow fiberglass shell installation instructions (may vary). Determine location for water on/off handles and faucet. Drill holes in fiberglass and hook up handles. Hook up drain.