Answer by
nairjula (559)
The first thing you need to do is shingling up to the transition splitting the difference and keep on going. Put nails on the upper slope and exposed portion of the shingle on the lower steeper slope. After a weeks time the shingle will lay down on its own and the shingling gambrel roof is installed.