Answer by
GoldwingAspencade (24)
Start at the bottom edge of the roof laying shingles at 45 degree angles. Work from one side to the other in complete rows to the peak of the roof useing roofing nails to fasten each shingle. Then trim all overhanging edges. Now put row across peak to seal peak.