joeinphilly (388)
Depends on the wiring. Service Entry cable will be buried according to your power company requirements and will most likely be packed with sand, gravel and then covered with dirt. If you are running a branch circuit from your panel use conduit or underground cable and then put it down at least 2 feet. Make a diagram for future reference!!!!!