Question by  jmo81rn (36)

What should I know about laying a driveway?

 
+8

Answer by  Jimbob (2275)

You should put down a base layer of course pit run gravel to allow a base for the water to drain. Then you will want to drive on this for about a year to get it packed down. Then after it is packed you will add a finer layer of gravel for the top.

 
+6

Answer by  turkworker (1007)

First, lay a base layer of course pit run gravel to allow for water drainage. Then pack it down and add a finer layer of gravel on top.

 